Measurement and control tasks for the power distribution and renewable energy: temperature or acoustic measurement, condition monitoring of facilities, power data monitoring, ­energy consumption of facilities, control of wing resistivity, control of solar panels or rotor blades. ADDI-DATA measurement and control systems enable you to acquire various sensor data like temperature, noise, pressure etc.

Product applications for power distribution and renewable energy

Long-term temperature measurement in wind power plants

 

power distribution

Challenge

A wind power manufacturer plants is looking for the reason of repeated breakdowns of wind turbines. He assumes that the reason is an overheating of the PCs in the switch cabinet located inside the tower. A data logger is to make a long-term measurement of the temperature and record when the ventilation system is switched on and off. The measurement system is to be portable because the long-term measurement is to be made in all towers of the plant. Furthermore, it must be resistant against harsh environment and interferences. The acquired data are imported from the system directly into Excel.

Read more!

 

Increase the yield of a photovoltaic plant

 

power distribution

Challenge

Photovoltaic plant must be adjusted in order to earn the maximum current yield by taking into account the trajectory of the sun or the presence of clouds.

Read more!

 

Measurement tasks in a coal power plant

 

Power Distribution and Renewable Energy

Challenge

A coal power plant needs to detect the energy loss occurring in different areas of the power plant in order to minimize the energy loss and optimize the energy production process. Therefore, various parameters like temperature, pressure, etc. have to be monitored at different locations of the plant, for example in switch cabinets. The test points are located in far distributed locations of the plant. The check needs to be done on a weekly basis. The data has to be acquired in real time and needs to be sent to a laptop, where it is processed and evaluated.

Read more!